Date Completed: December 2020
When Hurricane Laura destroyed a building in Lecompte, LA on August 27th, were the first call. We were onsite 2 days later and started work the same day. Despite having to drive 2 ½ hours to the next hotel, we had the safely down and cleaned up in 2 days. We then got to work and commissioned soil testing and engineering so we could install (10) new footers around the existing containment slab.
To build it back bigger, better, and faster, we fabricated and painted a new 4,476 SF PEMB in our shop in Birmingham, AL. The building consisted of a 10’-0” overhang and liner panels on (2) walls. The building was provided with sealed drawings.