US Pipe South Melt Shop Wall

Project: 202106 R&R Sheeting and Sub-framing Location: Fairfield, AL Owner: US Pipe GC: Plant Maintenance Date Completed: January 2021 Removed and replaced approximately 7200 sq. ft. on existing wall sheeting, facia, and sub-framing on east side of mold shop at the US Pipe facility in Fairfield Alabama. Power was disconnected thru Owner coordination at locations … Read More

Hanna Steel Containment Floor

Project: 2020111 Hanna Steel Containment Floor Location: Fairfield, AL Owner: Hanna Steel Date Completed: December 2020 Cleaned and installed approximately 160 LF. of 4×6 angle to construct a containment bay to control paint spillage on the second-floor paint booth at the Hanna Steel Facility in Fairfield Alabama. Existing floor at the perimeter was cleaned and … Read More

Atlas Tube Columns

Project: Atlas Tube Crane Columns Location: Birmingham, AL Owner: Zekelman Industries, Inc Date Completed: December 2020 Atlas Tube wanted to showcase their own products in their new Slitter Building. We were commissioned to replace the existing wide flange crane columns and tie backs with tube columns and tube tie backs. We hired the sealing engineer … Read More