Project: 202106 R&R Sheeting and Sub-framing
Location: Fairfield, AL
Owner: US Pipe
GC: Plant Maintenance
Date Completed: January 2021

Removed and replaced approximately 7200 sq. ft. on existing wall sheeting, facia, and sub-framing on east side of mold shop at the US Pipe facility in Fairfield Alabama. Power was disconnected thru Owner coordination at locations where work came within 10’ proximity to power supplies. Job was performed during the plants yearly shut down for safety purposes. Job completed on time of shut down and at budget.
Painting subcontractor working thru Birmingham & Associates was contracted for painting of the block building connected to the building re-sheeted. Work was performed and completed during shut down.