Project: EC&S/Bermco
Location: Birmingham, AL
Owner: Bermco Aluminum
Date Completed: August 2020
Building A
Set structural steel and secondary framing install over the top of existing occupied building.
Building is 23,200 square foot. Installed metal wall sheeting and FRP roof panels.
Demolition Building A
Removed existing FRP roof sheeting and sub framing box beams and stored on site. Cut lose all existing low valley gutter framing and disposed of on site.
Building B
Removed existing FRP wall panels from south wall of existing shredder building, Installed approximately 4,500 square foot, single slope building. Building consists of structural steel and framing. Roof installed is a new FRP roof with used FRP panels for the walls.