Project: Darpro Lecompte Location: Lecompte, LA Owner: Darling Ingredients Date Completed: December 2020 When Hurricane Laura destroyed a building in Lecompte, LA on August 27th, were the first call. We were onsite 2 days later and started work the same day. Despite having to drive 2 ½ hours to the next hotel, we had the … Read More

Darpro Roof Retrofit

Project: Darpro Roof Retrofit Location: Tama, IA Owner: Darling Ingredients Date Completed: September 2020 This project is a 3,623 SF retrofit roof. After a derecho completely demolished the roof of the Darpro Rendering plant in Tama, IA on August 10th, we were on site the very next day to assess the damage and get to … Read More

Unipres Expansion

Project: Unipres Expansion Location: Steele, Al Owner: Unipres Alabama Date Completed: November 2019 The Unipres expansion included a 138,600 square foot expansion. Features: Highbay: 31,000 square feet with 55’ eave height and 22.5 ton bridge crane. 12’x110’ electrical mezzanine 95’ clear span bar joist. Standing seam roof system.

Darpro Clinton DAF Building

Project: Darpro Clinton DAF Building Location: Clinton, IA Owner: Darling Ingredients Date Completed: October 2019 The is a new 1,961 SF “T” Shaped PEMB wedged between (3) existing buildings. Our scope included removing the existing slab and pouring a new 10” thick slab, new footings, new access ramp, and landing. The slab included a new … Read More

East St Louis Cooker Room

Project: East St Louis Cooker Room Location: East St Louis, IL Owner: Darling Ingredients Date Completed: December 2019 Our scope includes installing 5,385 SF of 24 ga stainless- steel liner panels over existing walls. This job involved working around a large amount of conduit and process piping. We utilized special engineered scaffolding for hard-to-reach places … Read More

FKC- Lakeshore Service Headframe Structure

Project: FKC-Lakeshore Head Frame Location: Northport, AL. Owner: Warrior Met Coal GC: Date Completed: January 2021 Furnished labor, equipment & tools for the offload and erection of 120’ tall head frame over an 1,800 ft. deep elevator shaft. Items included where fabricated, galvanized structural steel tower componence. Framing included the elevator shaft, above grade rails, … Read More

Embridge Roof demolition and Room/Wall Modifications

Project: Embridge Roof demolition and Room/Wall Modifications Location: Mt. Pleasant TN. Owner: Embridge Corp. GC: Walden Construction Date Completed: November 2020 Removed existing roof of pump room, approximately 3500 square foot of flat roof and decking. Installed primary and secondary framing for a symmetrical gable roof system and standard PEMB wall framing. Walls were framed … Read More

EC&S-Bermco

Project: EC&S/Bermco Location: Birmingham, AL Owner: Bermco Aluminum Date Completed: August 2020 Building A Set structural steel and secondary framing install over the top of existing occupied building. Building is 23,200 square foot. Installed metal wall sheeting and FRP roof panels. Demolition Building A Removed existing FRP roof sheeting and sub framing box beams and … Read More

JCR Recycling

Project: JCR Recycling Wall Repair Location: Cullman, AL Owner: JCR Recycling GC: Eidson & Associates, Inc Date Completed: September 2020 When JCR recycling was on fire, the firefighters were forced to demolish a part of the wall with a track hoe. We replaced the wall girts, insulation, and wall panels on T&M.

Enviroflight Emergence Rooms

Project: Enviroflight Emergence Rooms Location: Maysville, KY Owner: Darling Ingredients Date Completed: December 2020 Enviroflight needed to make their (8) Emergence Rooms so tight, that even flies can’t get through as well as watertight enough that the rooms can be washed down on a regular basis. The (8) rooms were 18’-6” x 13’-6” each. Our … Read More